Coal Fired Boiler Baghouse - Boiler Manufacturer

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Coal Fired Boiler Baghouse - Boiler Manufacturer
  • Supply Capacity : 10 units/month :Coal Fired Boiler Baghouse - Boiler Manufacturer
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

About us Fangkuai has more than 20 years of experience in R&D and manufacturing of green energy-saving boiler equipment, and is committed to designing and producing boilers that meet customer needs.
Contact us

Global Sales Hotline

telephone:
0086-55929010

Email: [email protected]

Voicemail
  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    (b) If you own or operate an existing or new biomass-fired boiler or an existing or new oil-fired boiler, you must conduct a performance tune-up according to § 63.11210(c) or, as applicable, and § 63.11223(b). If you own or operate an existing biomass-fired boiler or existing oil-fired boiler, you must submit a signed statement in the Get Price

  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    (b) If you own or operate an existing or new biomass-fired boiler or an existing or new oil-fired boiler, you must conduct a performance tune-up according to § 63.11210(c) or, as applicable, and § 63.11223(b). If you own or operate an existing biomass-fired boiler or existing oil-fired boiler, you must submit a signed statement in the Get Price

  • Engineering Handbook For Hazardous Waste Incineration

    These liquids are burned in the side walls. The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C.Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    (b) If your boiler or process heater is in the unit designed to burn coal/solid fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you demonstrate compliance with the PM limit instead of the Get Price

  • Solution Manual Of Engineering Economy 16th Ed by William

    a coal-fired electricity generating plant and facilities. A. work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information. available: A coal-fired generating plant twice the size of the; one you are estimating was built in 1993. The 1993. boiler (1.2) and boiler support system (1.3) cost $110 Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    (b) If your boiler or process heater is in the unit designed to burn coal/solid fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you demonstrate compliance with the PM limit instead of the Get Price

  • Engineering Handbook For Hazardous Waste Incineration

    These liquids are burned in the side walls. The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C.Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    (b) If your boiler or process heater is in the unit designed to burn coal/solid fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you demonstrate compliance with the PM limit instead of the Get Price

  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    (b) If you own or operate an existing or new biomass-fired boiler or an existing or new oil-fired boiler, you must conduct a performance tune-up according to § 63.11210(c) or, as applicable, and § 63.11223(b). If you own or operate an existing biomass-fired boiler or existing oil-fired boiler, you must submit a signed statement in the Get Price

  • Solution Manual Of Engineering Economy 16th Ed by William

    a coal-fired electricity generating plant and facilities. A. work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information. available: A coal-fired generating plant twice the size of the; one you are estimating was built in 1993. The 1993. boiler (1.2) and boiler support system (1.3) cost $110 Get Price

  • Engineering Handbook For Hazardous Waste Incineration

    These liquids are burned in the side walls. The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C.Get Price

  • Solution Manual Of Engineering Economy 16th Ed by William

    a coal-fired electricity generating plant and facilities. A. work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information. available: A coal-fired generating plant twice the size of the; one you are estimating was built in 1993. The 1993. boiler (1.2) and boiler support system (1.3) cost $110 Get Price